So here's a summary in pictures and a few words:
After some thought, I decided to have the windscreen frame professional recondtioned. Not cheap but the MGB screen is a major visual focal point of the car and I wanted it to look right. It was away for about 3 weeks and I'm pleased with the result.
Work on the engine bay continued.
The carbs went away for restoration. Bling!
Engine bay nears completion
Attention turned to the interior. Dash and sound deadening.
Installed the fuel filler neck
And then worked on the doors
Next job will be the side moldings and refitting the boot and bonnet.
No comments:
Post a Comment